California ISO: Operational perspectives
Conference
·
OSTI ID:554963
On December 20, 1995, the California Public Utilities Commission (CPUC) voted 3-2 in favor of a plan to restructure California`s electricity market. CPUC`s decision envisions a new market structure for electric utilities that offers customers more choice and flexibility in energy services at lower prices and would serve to move the state`s utilities from the traditional monopolistic structure to a more market-driven system. The proposed market system is called, in a general sense of reference, Western Power Exchange (WEPEX). Within the WEPEX process, an Independent System Operator (ISO) and a Power Exchange (PX or PEX) will be established. The ISO and PX are to be separate and independent, nonprofit organizations regulated by the Federal Energy Regulatory Commission (FERC). Initially the ISO will have operational jurisdiction over Southern California Edison`s 500 kV and 230 kV system, as well as Pacific Gas & Electric`s and San Diego Gas & Electric`s transmission system 500 kV through 60 kV, with a few special exceptions. Three investor owned utilities (IOUs), San Diego Gas & Electric (SDG&E), Southern California Edison (SCE), and Pacific Gas & Electric (PG&E), along with stake-holders in compliance with the CPUC`s decision, are working together to implement the Independent System Operator (ISO). The three IOUs subsequently transfer control of ISO related work such as this to a Trust to be established in accordance with and approval of the California State Public Utilities Commission.
- OSTI ID:
- 554963
- Report Number(s):
- CONF-961232--
- Country of Publication:
- United States
- Language:
- English
Similar Records
California`s ISO: Why not clear the market?
Alternatives to the 15% Rule: Modeling and Hosting Capacity Analysis of 16 Feeders
Draft Electric Rule 21 Test Protocols for Advanced Inverter Functions
Journal Article
·
Sat Nov 30 23:00:00 EST 1996
· Electricity Journal
·
OSTI ID:482529
Alternatives to the 15% Rule: Modeling and Hosting Capacity Analysis of 16 Feeders
Technical Report
·
Tue Sep 01 00:00:00 EDT 2015
·
OSTI ID:1432924
Draft Electric Rule 21 Test Protocols for Advanced Inverter Functions
Technical Report
·
Sun Nov 30 23:00:00 EST 2014
·
OSTI ID:1762017