Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Airlift recirculation well test results -- Southern sector

Technical Report ·
DOI:https://doi.org/10.2172/554815· OSTI ID:554815
Chlorinated solvents used in the A and M-Areas at the Savannah River Site (SRS) from 1952--1982 have contaminated the groundwater under the site. A plume of groundwater contaminated with trichloroethylene (TCE) and perchloroethylene (PCE) in the Lost Lake aquifer is moving generally southward with the natural flow of groundwater. To comply with the requirements of the current SCDHEC Part B Permit, a series of wells is being installed to contain and treat the plume. Airlift Recirculation Wells (ARW) are a new and innovative technology with potential for more cost effective implementation than conventional pump and treat systems. Two Airlift Recirculation Wells have been installed and tested to quantify performance parameters needed to locate a line of these wells along the leading edge of the contaminant plume. The wells proved to be very sensitive to proper development, but after this requirement was met, performance was very good. The Zone of Capture has been estimated to be within a radius of 130--160 ft. around the wells. Thus a line of wells spaced at 250 ft. intervals could intercept the contaminant plume. At SSR-012, TCE was stripped from the groundwater at approximately 1.2 lb./day. The longer term effect of the recirculation wells upon the plume and the degree of recirculation within the aquifer itself will require additional data over a longer time period for an accurate review. Data collection is ongoing.
Research Organization:
Westinghouse Savannah River Co., Aiken, SC (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC09-96SR18500
OSTI ID:
554815
Report Number(s):
WSRC-TR--97-00246; ON: DE97054220
Country of Publication:
United States
Language:
English