Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Decommissioning planning and the assessment of alternatives for the Hanford production reactors

Technical Report ·
OSTI ID:5529704
Several years ago, the US Department of Energy began assessing alternatives and planning the decommissioning of eight shut-down plutonium production reactors located on the DOE Hanford Site in Washington State. The first of these graphite-moderated, water-cooled, reactors was built and started up in 1944 as part of the World War II Manhattan Project. The last of them started up in 1955. The eight reactors each operated for 12 to 24 years, with all eight operating simultaneously for about 10 years. In the 1960's, production needs declined and the reactors were one-by-one permanently shut down, the last of them in 1971. (A ninth Hanford production reactor, N Reactor, was started up in 1963; it is still operating and is not within the scope of the decommissioning planning and alternatives assessment work reported in this paper). This paper provides an overview description of the decommissioning plan for the eight shut-down Hanford production reactors and their associated fuel storage basins. Included are descriptions of the decommissioning alternatives considered for the facilities, along with discussions of National Environmental Policy Act (NEPA) process activities applicable to the Hanford decommissioning work. The criteria used in assessing decommissioning alternatives and the assumptions used in the decommissioning planning are identified. 4 refs., 8 figs., 3 tabs.
Research Organization:
United Nuclear Industries, Inc., Richland, WA (USA)
DOE Contract Number:
AC06-76RL01857
OSTI ID:
5529704
Report Number(s):
UNI-SA-151; ON: DE85015169
Country of Publication:
United States
Language:
English