Results of control-room annunciator-systems evaluations
Conference
·
OSTI ID:5515137
Annunciator systems in nuclear power plants tax the operator's ability to cope with large amounts of information. Conventional annunciators do not provide the information in an acceptable way for efficient response, but computer-generated CRT displays have the potential for rectifying this situation. A multidisciplinary team of human factors engineers from EG and G Idaho conducted a study to (a) identify problem areas in reactor control rooms associated with annunciator display systems, (b) provide specific and generic solutions to the problems identified, and (c) provide recommendations and direction for future improvements and research focused on the man/display interface from a human factors engineering perspective.
- Research Organization:
- EG and G Idaho, Inc., Idaho Falls (USA)
- DOE Contract Number:
- AC07-76ID01570
- OSTI ID:
- 5515137
- Report Number(s):
- EGG-M-09381; CONF-811042-22; ON: DE82005648
- Country of Publication:
- United States
- Language:
- English
Similar Records
Human factors evaluation of the engineering test reactor control room
The Advanced Candu reactor annunciation system - Compliance with IEC standard and US NRC guidelines
Human-factors review of electric-power-dispatch control centers. Volume 5. Information management and presentation summary. Final report
Technical Report
·
Sat Feb 28 23:00:00 EST 1981
·
OSTI ID:6479361
The Advanced Candu reactor annunciation system - Compliance with IEC standard and US NRC guidelines
Conference
·
Sat Jul 01 00:00:00 EDT 2006
·
OSTI ID:22030094
Human-factors review of electric-power-dispatch control centers. Volume 5. Information management and presentation summary. Final report
Technical Report
·
Mon Feb 28 23:00:00 EST 1983
·
OSTI ID:6310122