100-Kilowatt solar photovoltaic flat-panel power system for the combined Beverly High School/C. H. Patten Vocational High School, Beverly, Massachusetts. Phase III. System operation and evaluation
Technical Report
·
OSTI ID:5501352
This report describes the first year's operation of a 100-kW photovoltaic flat-plate system at Beverly High School, Beverly, Massachusetts. Also included in the report are separate first-year reports by Stone and Webster, New England Electric System, and the Beverly Public School System. Over the reporting period, the systems produced nearly 90,000 kWh of electricity valued at nearly $5000 at an average buy-back rate from the utility of 5.78 cents/kWh. The cost of operation and maintenance during this first year was excessive, nearly equal to the total value derived from the energy. The system reliability problems have been addressed, and the operation and maintenance for the next year is expected to be about 10% of the energy value.
- Research Organization:
- Solar Power Corp., Woburn, MA (USA)
- DOE Contract Number:
- AC04-76DP00789
- OSTI ID:
- 5501352
- Report Number(s):
- DOE/ET/20631-T1; ON: DE85015530
- Country of Publication:
- United States
- Language:
- English
Similar Records
100 kilowatt solar photovoltaic flat panel power system for the combined Beverly High School/C. H. Patten Vocational High School, Beverly, Massachusetts
194 kilowatt solar photovoltaic flat panel power system for the combined Beverly High School/C. H. Patten Vocational High School, Beverly, Massachusetts. Final technical report, October 1, 1978-March 31, 1979
Intermediate photovoltaic system application experiment operational performance report. Volume 9 for Beverly High School, Beverly, Massachusetts
Conference
·
Wed Dec 31 23:00:00 EST 1980
· Proc. Annu. Meet. - Am. Sect. Int. Sol. Energy Soc.; (United States)
·
OSTI ID:5951208
194 kilowatt solar photovoltaic flat panel power system for the combined Beverly High School/C. H. Patten Vocational High School, Beverly, Massachusetts. Final technical report, October 1, 1978-March 31, 1979
Technical Report
·
Sun Jun 01 00:00:00 EDT 1980
·
OSTI ID:5354946
Intermediate photovoltaic system application experiment operational performance report. Volume 9 for Beverly High School, Beverly, Massachusetts
Technical Report
·
Thu Jul 01 00:00:00 EDT 1982
·
OSTI ID:5354956
Related Subjects
14 SOLAR ENERGY
140600* -- Solar Energy-- Photovoltaic Power Systems
BUILDINGS
DATA ACQUISITION SYSTEMS
ECONOMICS
EDUCATIONAL FACILITIES
EFFICIENCY
ELECTRICAL EQUIPMENT
ELECTRONIC EQUIPMENT
ENERGY EFFICIENCY
EQUIPMENT
INFORMATION
INVERTERS
MAINTENANCE
OPERATION
PERFORMANCE TESTING
PHOTOVOLTAIC POWER SUPPLIES
POWER RANGE 10-100 KW
POWER SUPPLIES
PUBLIC INFORMATION
RECOMMENDATIONS
SCHOOL BUILDINGS
SOLAR CELL ARRAYS
SOLAR EQUIPMENT
TESTING
140600* -- Solar Energy-- Photovoltaic Power Systems
BUILDINGS
DATA ACQUISITION SYSTEMS
ECONOMICS
EDUCATIONAL FACILITIES
EFFICIENCY
ELECTRICAL EQUIPMENT
ELECTRONIC EQUIPMENT
ENERGY EFFICIENCY
EQUIPMENT
INFORMATION
INVERTERS
MAINTENANCE
OPERATION
PERFORMANCE TESTING
PHOTOVOLTAIC POWER SUPPLIES
POWER RANGE 10-100 KW
POWER SUPPLIES
PUBLIC INFORMATION
RECOMMENDATIONS
SCHOOL BUILDINGS
SOLAR CELL ARRAYS
SOLAR EQUIPMENT
TESTING