Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Superhilac upgrade project

Conference ·
OSTI ID:5485834
This project will increase the uranium output of the Bevalac heavy-ion facility from the currently available 10/sup 7/ to 5 x 10/sup 7/ ions/pulse, allowing accurate Lamb shift measurements to be made in U/sup 90 +/ and U/sup 91 +/ with important applications to the testing of quantum electrodynamics and the development of an x-ray laser. The injected beam intensity will be increased to make better use of the 10emA output space-charge limit of the Wideroe linac. Components will include a new high current MEtal Vapor Vacuum Arc (MEVVA) ion source along with an improved high current, high voltage Cockcroft-Walton power supply to handle the increased beam current. The Low Energy Beam Transport (LEBT) line will be upgraded with additional focusing to manage the increased space-charge forces and with an improved vacuum to reduce charge exchange losses. Finally, the phase matching between the 23MHz Wideroe linac and the 70MHz Alvarez linac will be improved by the addition of the appropriate buncher cavities. Physics design is underway and detailed engineering is scheduled to begin in October 1985, with installation slated for the 1986 summer shutdown.
Research Organization:
Lawrence Berkeley Lab., CA (USA)
DOE Contract Number:
AC03-76SF00098
OSTI ID:
5485834
Report Number(s):
LBL-18959; CONF-850504-234; ON: DE85015245
Country of Publication:
United States
Language:
English

Similar Records

The superhilac upgrade project
Conference · Tue Oct 01 00:00:00 EDT 1985 · IEEE Trans. Nucl. Sci.; (United States) · OSTI ID:6121202

SuperHILAC Upgrade Project
Conference · Sun Jun 01 00:00:00 EDT 1986 · OSTI ID:5237133

The SuperHILAC heavy ion intensity upgrade
Conference · Sat Feb 28 23:00:00 EST 1987 · OSTI ID:6178689