Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Basewide engineering evaluation-cost analysis for soil vapor extraction. Site specific document OU C1. Final report

Technical Report ·
OSTI ID:5483799
This document supports the use of soil vapor extraction (SVE) as the non-time-critical removal action for selected areas with high levels of volatile organic compound (VOC) contamination in Operable Unit C1 (OU C1). This SVE removal action is part of the initial basewide SVE removal action at McClellan Air Force Base (McAFB). The principal objective of basewide SVE removal actions is to achieve early risk reduction by removing a significant quantity of VOCs from soils in the vadose zone, intercepting an exposure pathway, or preventing additional flux to the groundwater. This document is a companion to the Basewide Engineering Evaluation-Cost Analysis (EE/CA) General Evaluation Document.
Research Organization:
McClellan AFB, CA (United States)
OSTI ID:
5483799
Report Number(s):
AD-A-273524/9/XAB
Country of Publication:
United States
Language:
English