Rocky Mountain Arsenal, sanitary sewer interim response action, construction documents for new sanitary sewer construction. Volume 2
The primary objective of this interim response action is to prevent the potential spread of contamination via the sanitary sewer system. The IRA will consist of (1) Construction of a new sanitary sewer, and (2) Sealing of the existing sewer in the north plants and south plants areas along with the interceptor line in section 36. Sections and appendices of this final implementation plan include: (1) Background and overview of course of action; (2) Procedures for sealing the existing sewer lines with concrete; (3) Schedule of closure events; (4) Health and safety plan for closure of existing lines; (5) Specifications and plans for the new sanitary sewer; (6) Chemical, physical, and biological properties of contaminants; and (7) Request for proposals.
- Research Organization:
- Weston (Roy F.), Inc., Lakewood, CO (United States)
- OSTI ID:
- 5474951
- Report Number(s):
- AD-A-273513/2/XAB; DAAA-15-88-R-0023
- Country of Publication:
- United States
- Language:
- English
Similar Records
Rocky Mountain Arsenal, sanitary sewer, interim response action, draft implementation plan, volume 1
Decision document for the sanitary sewer system interim response action at Rocky Mountain Arsenal. Final report
Related Subjects
LAND POLLUTION ABATEMENT
ENVIRONMENTAL ENGINEERING
POLLUTANTS
CHEMICAL ANALYSIS
CONTAINMENT
BITUMINOUS MATERIALS
HYDROSTATICS
SEALING MATERIALS
SOILS
WASTE PROCESSING
CARBONACEOUS MATERIALS
ENGINEERING
MANAGEMENT
MATERIALS
POLLUTION ABATEMENT
PROCESSING
WASTE MANAGEMENT
540250* - Environment
Terrestrial- Site Resource & Use Studies- (1990-)