Seismic review of vault for MFTF upgrade project

Technical Report ·
DOI:https://doi.org/10.2172/5470605· OSTI ID:5470605
This letter report was prepared in accordance with the scope of work for the preconceptual seismic evaluation of the (..cap alpha.. + T) Tandem Mirror Fusion Machine concrete vault. The scope of the work was developed with the assistance of the Bechtel site representative Dr. Sunil Ghose. The report contains comments and preconceptual recommendations on wall upgrading for an 150-ton crane installation, concrete vault seismic capability for (..cap alpha.. + T) conditions, and recommendations for future work.