Final report on PE-II activities from August 1981-September 1983

Technical Report ·
OSTI ID:5463921
This report documents all of the technical work performed by EG and G Idaho, Inc., from August 1981 through 1983 on Program Element-II (Blanket/Shield Thermal-Hydraulic/Thermomechanical Technology) of the Department of Energy (DOE) Office of Fusion Energy's First Wall/Blanket/Shield Engineering Technology Program. Following Section 1 which is a summary of the overall program, six major activities are described in separate sections. Section 2 is an evaluation of methods for simulation fusion bulk heating for thermal-hydraulic/thermomechanical testing. Section 3 is a survey of facilities which might be suitable for such testing. Section 4 describes the development of a strategy for resolving the identified thermal-hydraulic/thermomechanical data needs through a combination of nuclear and nonnuclear testing. Section 5 is a detailed plan for work in Phase I of Program Element-II. Sections 6 and 7 describe two activities undertaken by EG and G: the design of the nonnuclear solid-breeder concept integral simulation test, and the planning for a nuclear test which could follow it. Following these activities, EG and G participation in Program Element-II was terminated; thus, this report serves as the final report on technical work for Program Element-II at Eg and G.
Research Organization:
EG and G Idaho, Inc., Idaho Falls (USA)
DOE Contract Number:
AC07-76ID01570
OSTI ID:
5463921
Report Number(s):
EGG-FT-6392; ON: DE84002521
Country of Publication:
United States
Language:
English