Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Test Series 2. 2 report, Volume I. Main report

Technical Report ·
OSTI ID:5463334
The Test Series 2.2 research program was carried out between November 1983 and February 1984 at the Grimethorpe Experimental Pressurized Fluidized Bed Combustion Facility. The tests used a coal and limestone nominated by the FRG and provided operating experience with a third tube bank, Tube Bank 'C2'. The period consisted of 578 coal burning hours, which included 375 data collection hours. The report provides a description of the Facility as it was used and modified during Test Series 2.2. The test plan and objectives are detailed. Performance data are presented in respect of the following: combustion efficiency; sulphur retention; NO/sub x/, SO/sub 3/ and CO gaseous emissions; bed chracteristics; heat transfer and in-bed temperatures; bed material breakdown, ''splash'' and elutriation; cyclone performance; pressure pulsations; alkali, chlorine and fluorine emissions; tube bank metal wastage; cascade blade exposure; and the combined cycle-related tests. The data evaluation and analysis procedures are also presented. The results indicate a continued improvement in data gathering capability and plant reliability over previous test series.
Research Organization:
NCB (IEA Grimethorpe) Ltd., Grimethorpe, Barnsley, South Yorkshire (UK)
DOE Contract Number:
AI01-76ET10393
OSTI ID:
5463334
Report Number(s):
DOE/ET/10393-1858-Vol.1; ON: DE85008588
Country of Publication:
United States
Language:
English

Similar Records

Test Series 2. 3 report. Volume I. Main report
Technical Report · Sun Sep 01 00:00:00 EDT 1985 · OSTI ID:5207366

Test Series 2. 1 report. Volume I. Main report
Technical Report · Mon Aug 01 00:00:00 EDT 1983 · OSTI ID:6633886

Screening tests report. Volume I
Technical Report · Sun Jul 01 00:00:00 EDT 1984 · OSTI ID:6077282