Draft Supplement to the Environmental Statement Fiscal Year 1976 Proposed Program : Facilty Location Evaluation for Franklin-Badger Canyon 230-kV Line and Badger Canyon Substation Study Area 74-6B.
Proposed is the construction of a 15-mile, 230-kV double-circuit transmission line from Franklin Substation near Pasco, Washington, to a proposed new Badger Canyon Substation to be constructed 5 miles west of Kennewick, Washington. Depending on the final route location chosen, approximately 15 miles of 230-kV double circuit transmission line requiring 5.6 miles of new and 9.4 miles of existing right-of-way would be needed as well as approximately 2500 feet of new access road. Land use affected includes crossing Sacajawea State Park and passig through irrigated cropland and grassland on existing right-of-way, and depending on the alternative route chosen, could cross land proposed for residential development and a proposed interstate highway. An additional 10 to 11 acres of potential cropland would be required for the proposed substation. Disturbance to wildlife during construction would occur and habitat associated with the above land uses would be eliminated. Some erosion and sedimentation would occur. Visual impacts would affect Sacajawea State Park, a proposed highway, and potential residential development land. Noise and other disturbances to residents will occur, primarily during construction.
- Research Organization:
- Bonneville Power Administration, Portland, OR (USA)
- OSTI ID:
- 5451274
- Report Number(s):
- DES-74-92; ON: DE85016099
- Country of Publication:
- United States
- Language:
- English
Similar Records
Draft Supplement to the Environmental Statement, Fiscal Year 1976 Proposed Program : Facility Location Evaluation for Ashe-Pebble Springs 500-KV Line, Study Area 75-3A.
Draft Supplement to the Environmental Statement Fiscal Year 1976 Proposed Program : Facility Location Evaluation for Okanogan Area Service Study Area 75-6.