Selection and implementation of single building EMCS (Energy Monitoring and Control Systems). Final report Jan-Jul 83
Technical Report
·
OSTI ID:5450001
This report addresses the selection and implementation of single-building energy monitoring and control systems. The process is examined in three phases. The initial phase examines the selection of candidate buildings based on metered utility data, examination of building operation, examination of building systems and controls, and measured data. The second phase examined the capability of time clocks, duty cyclers, demand limiters, programmable controllers, micro EMCS and small EMCS. The functions performed by each are examined. Alternatives to EMCS are presented. An example calculation compares time clock control, time clock control with control enhancement, and small EMCS control of a typical air handling unit. The interface techniques for efficient installation and operation. A summary of the analysis steps follows.
- Research Organization:
- Stan and Associates, Inc., Dayton, OH (UA)
- OSTI ID:
- 5450001
- Report Number(s):
- AD-A-134006/6
- Country of Publication:
- United States
- Language:
- English
Similar Records
A commentary on the instrumentation for building energy monitoring and control systems (EMCS). Final report
EMCS for building management
EMCS and time-series energy data analysis in a large government office building
Technical Report
·
Mon Sep 01 00:00:00 EDT 1980
·
OSTI ID:5368754
EMCS for building management
Journal Article
·
Wed Jun 01 00:00:00 EDT 1983
· ASHRAE J.; (United States)
·
OSTI ID:5562443
EMCS and time-series energy data analysis in a large government office building
Conference
·
Sat Mar 31 23:00:00 EST 2001
·
OSTI ID:787118