skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Waste Isolation Pilot Plant supplementary roof support system underground storage area, Panel 1, Room 1

Technical Report ·
OSTI ID:5433478

WIPP is designed to provide a full-scale facility to demonstrate the technical and operational principles for permanent isolation of defense-generated transuranic waste. It is also designed to provide a facility in which studies and experiments can be conducted. Bin Scale Tests are being planned as part of the WIPP Test Phase Performance Assessment Program described in the WIPP Test Phase Plan: Performance Assessment (DOE 1990 b). These Tests are anticipated to be conducted over a period of up to seven years. Room 1 of Panel 1 of the Underground Storage Area is to be used as the location of the Bin-Scale Tests to investigate the generation of gas from the waste that is proposed to be stored at the WIPP in the near future. The original design for the waste storage rooms in Panel 1 provided for a limited period of time during which to mine the openings and to emplace waste. Room 1 was initially mined to rough dimensions in 1986. Information obtained from the Site and Preliminary Design Validation (SPDV) program showed that the rooms would remain stable without ground support and that creep closure would not adversely affect equipment clearances during at least five years following excavation.

Research Organization:
Westinghouse Electric Corp., Carlsbad, NM (United States). Waste Isolation Div.
Sponsoring Organization:
USDOE; USDOE, Washington, DC (United States)
DOE Contract Number:
AC04-86AL31950
OSTI ID:
5433478
Report Number(s):
DOE/WIPP-91-057; ON: DE92013700
Country of Publication:
United States
Language:
English