Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

SRC-I Project Baseline. Phases I and II: Appendix A; Appendix B. Phases IIIA and IIIB

Technical Report ·
OSTI ID:5414082
The Process Design Criteria Specification forms the basis for process design for the 6000-TPSD SRC-I Demonstration Plant. It sets forth: basic engineering data, e.g., type and size of plant, feedstocks, product specifications, and atmospheric emission and waste disposal limits; utility conditions; equipment design criteria and sparing philosophy; and estimating criteria for economic considerations. Previously the formal ICRC Document No. 0001-01-002 has been submitted to DOE and revised, as necessary, to be consistent with the SRC-I Project Baseline. Revision 6, dated 19 March 1982, 51 pages, was forwarded to DOE on 19 March 1982. The SRC Process Area Design Baseline consists of six volumes. The first four were submitted to DOE on 9 September 1981. The fifth volume, summarizing the Category A Engineering Change Proposals (ECPs), was not submitted. The sixth volume, containing proprietary information on Kerr-McGee's Critical Solvent Deashing System, was forwarded to BRHG Synthetic Fuels, Inc. for custody, according to past instructions from DOE, and is available for perusal by authorized DOE representatives. DOE formally accepted the Design Baseline under ICRC Release ECP 4-1001, at the Project Configuration Control Board meeting in Oak Ridge, Tennessee on 5 November 1981.
Research Organization:
International Coal Refining Co., Birmingham, AL (USA)
DOE Contract Number:
AC05-78OR03054
OSTI ID:
5414082
Report Number(s):
DOE/OR/03054-T12-Vol.2; ON: DE82015935
Country of Publication:
United States
Language:
English