Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Rig scarcity prompts innovative drilling solution

Journal Article · · World Oil
OSTI ID:541204
Unable to locate a shallow-water offshore rig for its program in Indonesia, British Gas International developed an innovative pad/ballasted barge configuration to utilize a land rig, which was available. Many non-typical problems were encountered and solved to establish the drilling location 600 m (2,000 ft) from the shore in Bintuni Bay in Irian Jaya, eastern Indonesia. The final hybrid configuration has sparked interesting debate as to whether the operation should be designated as onshore or offshore. The paper discusses the project overview, concept development, construction, and operations.
OSTI ID:
541204
Journal Information:
World Oil, Journal Name: World Oil Journal Issue: 11 Vol. 218; ISSN 0043-8790; ISSN WOOIAS
Country of Publication:
United States
Language:
English

Similar Records

Conoco's new approach to drill site construction in difficult, remote, swamp and jungle terrain Irian Jaya, Indonesia
Conference · Tue Jan 31 23:00:00 EST 1984 · Soc. Pet. Eng. AIME, Pap.; (United States) · OSTI ID:5103696

Indonesian drilling maintains steady pace
Journal Article · Wed May 01 00:00:00 EDT 1985 · Ocean Ind.; (United States) · OSTI ID:6271242

Jack-up leveling barge for shallow water rigs
Journal Article · Thu Jul 01 00:00:00 EDT 1982 · Ocean Ind.; (United States) · OSTI ID:6498910