Powerplant Productivity. Improvement Study: current practices in Illinois utilities towards powerplant productivity. Final report, Project 1, Task 1
Efforts of this task indicate that powerplant productivity is a complex issue that has to take into account economic factors, equipment limitations, and system-loading characteristics as well as external constraints such as regulatory requirements. Among the specific findings are: (1) utilities in Illinois use the industry-wide measures of performance such as capacity factor, availability factor, forced outage rates etc.; equivalent availability as a measure is not in common practice; (2) several unit performance statistics are collected on a routine basis such as the daily unit status, component outage data, monthly production figures etc.; (3) identifying major causes of lost productivity appears to be a relatively simple task, but finding economically and technically acceptable corrective actions are generally more difficult; (4) selection of improvement projects, as well as evaluating their future impacts, is mostly based on operating experience and engineering judgement, with no use of formal analytical/statistical models; (5) there generally is a group in every utility - typically called the power production department - with routine responsibilities for upkeep of unit productivity; and (6) recently the Commonwealth Edison Co. has developed a procedure for utilizing the Edison Electric Institute outage data base for analyzing productivity-related questions at nuclear plants; this procedure utilizes unit nonoperating hours to measure productivity.
- Research Organization:
- Illinois Commerce Commission, Springfield (USA)
- Sponsoring Organization:
- USDOE
- DOE Contract Number:
- FC01-77RG08138
- OSTI ID:
- 5411849
- Report Number(s):
- CONS-8138-T5
- Country of Publication:
- United States
- Language:
- English
Similar Records
Powerplant Productivity Improvement Study: historic performance of Illinois investor-owned electrical-generating units. Final report, Project 2, Task 1
Powerplant Productivity Improvement Study: project summary report
Analysis of costs and benefits for eight powerplant productivity improvement projects. Project 1, Task 3. Final report
Technical Report
·
Fri May 04 00:00:00 EDT 1979
·
OSTI ID:5273157
Powerplant Productivity Improvement Study: project summary report
Technical Report
·
Thu Dec 20 23:00:00 EST 1979
·
OSTI ID:5273149
Analysis of costs and benefits for eight powerplant productivity improvement projects. Project 1, Task 3. Final report
Technical Report
·
Fri Jun 08 00:00:00 EDT 1979
·
OSTI ID:5357612
Related Subjects
20 FOSSIL-FUELED POWER PLANTS
200106 -- Fossil-Fueled Power Plants-- Economics
29 ENERGY PLANNING, POLICY, AND ECONOMY
296001* -- Energy Planning & Policy-- Electric Power Generation-- (-1989)
CAPACITY
DATA ACQUISITION
ECONOMIC IMPACT
GREAT LAKES REGION
ILLINOIS
NORTH AMERICA
PERFORMANCE
POWER PLANTS
PRODUCTIVITY
USA
200106 -- Fossil-Fueled Power Plants-- Economics
29 ENERGY PLANNING, POLICY, AND ECONOMY
296001* -- Energy Planning & Policy-- Electric Power Generation-- (-1989)
CAPACITY
DATA ACQUISITION
ECONOMIC IMPACT
GREAT LAKES REGION
ILLINOIS
NORTH AMERICA
PERFORMANCE
POWER PLANTS
PRODUCTIVITY
USA