skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Engineering analyses for evaluation of gasification and gas-cleanup processes for use in molten-carbonate fuel-cell power plants. Task C

Technical Report ·
OSTI ID:5386466

This report satisfies the Task C requirement for DOE contract DE-AC21-81MC16220 to provide engineering analyses of power systems utilizing coal gasifiers and gas cleanup systems suitable for supplying fuel to molten carbonate fuel cells (MCFC) in industrial and utility power plants. The process information and data necessary for this study were extracted from sources in the public domain, including reports from DOE, EPRI, and EPA; work sponsored in whole or in part by Federal agencies; and from trade journals, MCFC developers, and manufacturers. The computer model used by Westinghouse, designated AHEAD, is proprietary and so is not provided in this report. The engineering analyses provide relative power system efficiency data for ten gasifier/gas cleanup fuel supply systems, including air- and oxygen-blown gasification, hot and cold desulfurization, and a range of MCFC operating pressure from 345 kPaa (50 psia) to 2069 kPaa (300 psia).

Research Organization:
Westinghouse Electric Corp., Pittsburgh, PA (USA)
DOE Contract Number:
AC21-81MC16220
OSTI ID:
5386466
Report Number(s):
DOE/MC/16220-T7; ON: DE82016735
Resource Relation:
Other Information: Portions of document are illegible
Country of Publication:
United States
Language:
English