Coal reburning for cyclone boiler NO sub x control demonstration
Technical Report
·
OSTI ID:5385030
This quarterly report has been prepared for Phase 1, Phase 2A, and Phase 2B of the Coal Reburning for Cyclone Boiler NO{sub x} Control Demonstration Project. The period covered by the quarterly report is January through March 1991. This report represents the fourth three-month period of the project. The subject of this report identifies progress during the quarter for Phase 1 -- Design and Permitting and Phase 2A -- Long Lead-Time Item Procurement, and Phase 2B -- Construction and Start-up. Under Phase 1, the following activities will be discussed. Task 1 -- Management and Reporting included completing the Preliminary Design Report. The Numerical and Physical Flow Modeling first draft report has been issued. The Baseline Characterization Report is due for completion in April 1991. Task 5 -- Design of the Reburn System, system drawings continue to be updated and revised. General engineering activities continue with emphasis on system controls and electrical design. Finally, Task 6 -- Permitting activities continue concentrating on Phase 2B items. Under Phase 2A -- Long Lead-Time Procurement, the flame scanner seal air fan, flame scanners, and the reburn system air monitors have been purchased. Phase 2B -- Construction and Start-up, involved completion of the foundation/substructure in March 1991, and spring outage activities, which included asbestos abatement and size reduction of the existing flue gas duct were completed. The reburn system design involves input from all the project's tasks and thus, this document assembles a summary of the tasks performed to date with the culmination being the proposed reburn system design.
- Research Organization:
- Babcock and Wilcox Co., Cassville, WI (United States)
- Sponsoring Organization:
- DOE; USDOE, Washington, DC (United States)
- DOE Contract Number:
- FC22-90PC89659
- OSTI ID:
- 5385030
- Report Number(s):
- DOE/PC/89659-T5; ON: DE91016805
- Country of Publication:
- United States
- Language:
- English
Similar Records
Coal reburning for cyclone boiler NO sub x control demonstration
Coal reburning for cyclone boiler NO sub x control demonstration
Coal reburning for cyclone boiler NO sub x control demonstration
Technical Report
·
Sun Dec 31 23:00:00 EST 1989
·
OSTI ID:5435124
Coal reburning for cyclone boiler NO sub x control demonstration
Technical Report
·
Sun Dec 31 23:00:00 EST 1989
·
OSTI ID:5981667
Coal reburning for cyclone boiler NO sub x control demonstration
Technical Report
·
Sun Dec 31 23:00:00 EST 1989
·
OSTI ID:6132633
Related Subjects
01 COAL, LIGNITE, AND PEAT
010800* -- Coal
Lignite
& Peat-- Waste Management
014000 -- Coal
Lignite
& Peat-- Combustion
20 FOSSIL-FUELED POWER PLANTS
200202 -- Fossil-Fueled Power Plants-- Waste Management-- Noxious Gas & Particulate Emissions
ADMINISTRATIVE PROCEDURES
AIR POLLUTION CONTROL
CHALCOGENIDES
COMBUSTORS
CONTROL
CONTROL EQUIPMENT
CYCLONE COMBUSTORS
DESIGN
DEVELOPED COUNTRIES
DOCUMENT TYPES
EQUIPMENT
FEDERAL REGION V
FOSSIL-FUEL POWER PLANTS
FUNCTIONAL MODELS
INSTALLATION
NITROGEN COMPOUNDS
NITROGEN OXIDES
NORTH AMERICA
OXIDES
OXYGEN COMPOUNDS
PERFORMANCE TESTING
PERMITS
PILOT PLANTS
POLLUTION CONTROL
POWER PLANTS
PROGRESS REPORT
START-UP
SULFUR COMPOUNDS
SULFUR DIOXIDE
SULFUR OXIDES
TESTING
THERMAL POWER PLANTS
USA
WISCONSIN
010800* -- Coal
Lignite
& Peat-- Waste Management
014000 -- Coal
Lignite
& Peat-- Combustion
20 FOSSIL-FUELED POWER PLANTS
200202 -- Fossil-Fueled Power Plants-- Waste Management-- Noxious Gas & Particulate Emissions
ADMINISTRATIVE PROCEDURES
AIR POLLUTION CONTROL
CHALCOGENIDES
COMBUSTORS
CONTROL
CONTROL EQUIPMENT
CYCLONE COMBUSTORS
DESIGN
DEVELOPED COUNTRIES
DOCUMENT TYPES
EQUIPMENT
FEDERAL REGION V
FOSSIL-FUEL POWER PLANTS
FUNCTIONAL MODELS
INSTALLATION
NITROGEN COMPOUNDS
NITROGEN OXIDES
NORTH AMERICA
OXIDES
OXYGEN COMPOUNDS
PERFORMANCE TESTING
PERMITS
PILOT PLANTS
POLLUTION CONTROL
POWER PLANTS
PROGRESS REPORT
START-UP
SULFUR COMPOUNDS
SULFUR DIOXIDE
SULFUR OXIDES
TESTING
THERMAL POWER PLANTS
USA
WISCONSIN