Characterization/decision analysis report for the ICPP-603 chloride removal system
Westinghouse Idaho Nuclear Company, Inc. (WINCO) has completed a physical, chemical, and radiological characterization of the CPP-603 (annex) Chloride Removal System (CRS) located at the Idaho Chemical Processing Plant (ICPP). In addition, a decision analysis was performed and the preferred method of decommissioning the CRS was identified. This method consists of removing all equipment and fixtures from the annex, decontaminating the annex to ALARA levels, and sealing the annex from the CPP-603 fuel storage basin. This report describes the CRS equipment and its operating history. General radiation fields inside the filter room were measured and representative samples were taken and analyzed to identify any radioisotopes or RCRA constituents and determine their concentrations. Also, waste volumes were estimated for each decommissioning alternative considered. 11 figs., 9 tabs.
- Research Organization:
- Westinghouse Idaho Nuclear Co., Inc., Idaho Falls, ID (United States)
- Sponsoring Organization:
- DOE; USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC07-84ID12435
- OSTI ID:
- 5381387
- Report Number(s):
- WINCO-1089; ON: DE91017798
- Country of Publication:
- United States
- Language:
- English
Similar Records
Decontamination and decommissioning of a small surplus facility
Decontamination and decommissioning of a small surplus facility
Related Subjects
053000* -- Nuclear Fuels-- Environmental Aspects
11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS
12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES
ALARA
CLEANING
COST
DECOMMISSIONING
DECONTAMINATION
FUEL REPROCESSING PLANTS
HAZARDOUS MATERIALS
IDAHO CHEMICAL PROCESSING PLANT
MANAGEMENT
MATERIALS
MONITORING
NATIONAL ORGANIZATIONS
NUCLEAR FACILITIES
RADIATION MONITORING
RADIOACTIVE MATERIALS
RADIOACTIVE WASTE MANAGEMENT
SAFETY
SECURITY
US AEC
US DOE
US ERDA
US ORGANIZATIONS
WASTE MANAGEMENT