Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Review of the Crystal River Nuclear Generating Station Unit No. 3, emergency feedwater system reliability analysis

Technical Report ·
OSTI ID:5376625
The purposes of this report are to review the Emergency Feedwater System Upgrade Reliability Analysis for the Crystal River Nuclear Generating Station Unit No. 3, and to provide an independent evaluation of the Emergency Feedwater System reliability. This report presents estimates of the probability that the Emergency Feedwater System will be unavailable given each of three different initiators: (1) loss of main feedwater with offsite power available, (2) loss of offsite power, (3) loss of all 4160 VAC power. The scope, methodology, and failure data are prescribed by NUREG-0611, Appendix III. 11 references, 5 tables.
Research Organization:
Brookhaven National Lab., Upton, NY (USA)
DOE Contract Number:
AC02-76CH00016
OSTI ID:
5376625
Report Number(s):
NUREG/CR-3081; BNL-NUREG-51626; ON: DE84004223
Country of Publication:
United States
Language:
English