Brief reconnaissance study for the addition of hydropower for Carr Fork Dam, Sassafras, Kentucky
Technical Report
·
OSTI ID:5358713
The feasibility of retrofitting the Carr Fork Dam near Hazard, KY for power generation was examined. This dam has a developable head of 80 ft and was built in 1975 to provide flood protection. The study of environmental, institutional, safety, and economic factors showed that the total investment cost would be $909,600 and that hydroelectric power development at this site is not feasible unless a higher price could be obtained for the power sold. (LCL)
- Research Organization:
- Gebhard (Thomas G.), Austin, TX (USA)
- DOE Contract Number:
- AC44-80R420006
- OSTI ID:
- 5358713
- Report Number(s):
- DOE/R4/20006-T15; ON: DE82017749
- Country of Publication:
- United States
- Language:
- English
Similar Records
Brief reconnaissance study for the addition of hydropower for Degaris Mill Dam, Georgetown, Kentucky
Brief reconnaissance study for the addition of hydropower for Wallace Dam, Georgetown, Kentucky
Brief reconnaissance study for the addition of hydropower for Dorthea Dam, Lily, Kentucky
Technical Report
·
Mon May 24 00:00:00 EDT 1982
·
OSTI ID:5290271
Brief reconnaissance study for the addition of hydropower for Wallace Dam, Georgetown, Kentucky
Technical Report
·
Mon May 24 00:00:00 EDT 1982
·
OSTI ID:5290212
Brief reconnaissance study for the addition of hydropower for Dorthea Dam, Lily, Kentucky
Technical Report
·
Mon May 24 00:00:00 EDT 1982
·
OSTI ID:5290260
Related Subjects
13 HYDRO ENERGY
130100 -- Hydro Energy-- Resources & Availability
130500* -- Hydro Energy-- Economic
Industrial
& Business Aspects
DAMS
ECONOMICS
ENVIRONMENTAL IMPACTS
FEASIBILITY STUDIES
FEDERAL REGION IV
HYDROELECTRIC POWER PLANTS
INSTITUTIONAL FACTORS
KENTUCKY
LOW-HEAD HYDROELECTRIC POWER PLANTS
NORTH AMERICA
POWER PLANTS
POWER POTENTIAL
RETROFITTING
SAFETY
USA
130100 -- Hydro Energy-- Resources & Availability
130500* -- Hydro Energy-- Economic
Industrial
& Business Aspects
DAMS
ECONOMICS
ENVIRONMENTAL IMPACTS
FEASIBILITY STUDIES
FEDERAL REGION IV
HYDROELECTRIC POWER PLANTS
INSTITUTIONAL FACTORS
KENTUCKY
LOW-HEAD HYDROELECTRIC POWER PLANTS
NORTH AMERICA
POWER PLANTS
POWER POTENTIAL
RETROFITTING
SAFETY
USA