Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Brief reconnaissance study for the addition of hydropower for Spray Dam, Eden, North Carolina

Technical Report ·
OSTI ID:5358704
The feasibility of retrofitting the Spray Dam near Eden, North Carolina for power generation was examined. This dam has a developable head of 10 ft., was built in 1898 for hydroelectric power generation with one of 2 installed units currently operating. The study of environmental, institutional, safety and economic factors showed that hydroelectric power development at this site is possible and that the economics of retrofits will depend on whether existing equipment can be repaired or will have to be replaced. (LCL)
Research Organization:
Gebhard (Thomas G.), Austin, TX (USA)
DOE Contract Number:
AC44-80R420006
OSTI ID:
5358704
Report Number(s):
DOE/R4/20006-T21; ON: DE82014703
Country of Publication:
United States
Language:
English