Rocky Reach: Gaining new equipment, skills for a new century
Journal Article
·
· Hydro Review
OSTI ID:535176
A summary is provided of modifications being made to the 1,287-MW Rocky Reach hydroelectric project on the Columbia River in Washington. Project modifications discussed include powerhouse rehabilitation and new fisheries projects. Replacement and retrofitting on all turbines is being performed to lower mortality rates of juvenile fishes migrating downstream. An electrical system overhaul is also described; performance testing indicates a 3.15 percent efficiency increase.
- OSTI ID:
- 535176
- Journal Information:
- Hydro Review, Vol. 16, Issue 2; Other Information: PBD: Apr 1997
- Country of Publication:
- United States
- Language:
- English
Similar Records
Rocky Reach: Preparing for the 21st century
Surface attraction fish bypass at Rocky Reach Dam
Water Velocity Measurements on a Vertical Barrier Screen at the Bonneville Dam Second Powerhouse
Journal Article
·
Tue Apr 01 00:00:00 EST 1997
· Hydro Review
·
OSTI ID:535176
Surface attraction fish bypass at Rocky Reach Dam
Conference
·
Sun Dec 31 00:00:00 EST 1995
·
OSTI ID:535176
Water Velocity Measurements on a Vertical Barrier Screen at the Bonneville Dam Second Powerhouse
Journal Article
·
Tue Nov 22 00:00:00 EST 2011
· Energies
·
OSTI ID:535176
+2 more