Research needs for the effective integration of new technologies into the electric utility
Conference
·
OSTI ID:5344826
- eds.
Twelve papers are included: R and D needs in utility expansion planning including new energy technologies; system reliability; load modeling barriers to new technology integration; impact of ownership form of alternative electric supply technology on the electric grid; issues in the negotiation of purchased power agreements between utilities and cogeneration and small power production facilities; power-conditioning interface equipment; operations and maintenance scheduling with new energy technologies; impacts of new energy technology generation and storage processes on power system stability and operability; power system architecture; distribution automation; R and D needs for integrating storage, load management and control technologies into utility systems; power quality issues in rural electric utility systems.
- Research Organization:
- Oak Ridge National Lab., TN (USA)
- DOE Contract Number:
- W-7405-ENG-26
- OSTI ID:
- 5344826
- Report Number(s):
- CONF-820772-; ON: DE84002974
- Country of Publication:
- United States
- Language:
- English
Similar Records
Power Sales to Electric Utilities
Utility interconnection issues with cogeneration
Applying Utility's Advanced Grid Technologies to Improve Resiliency of a Critical Load
Technical Report
·
Tue Jan 31 23:00:00 EST 1989
·
OSTI ID:860609
Utility interconnection issues with cogeneration
Conference
·
Sat May 01 00:00:00 EDT 1982
· IEEE Conf. Rec. Ind. Commer. Power Syst. Tech. Conf.; (United States)
·
OSTI ID:5561352
Applying Utility's Advanced Grid Technologies to Improve Resiliency of a Critical Load
Conference
·
Tue Nov 23 23:00:00 EST 2021
·
OSTI ID:1844362