Eddy-current inspection for steam generator tubing program. Quarterly progress report, June 30, 1981. [PWR; BWR]
Technical Report
·
OSTI ID:5338234
Eddy-current methods provide the best in-service inspection of steam generator tubing, but they can produce ambiguity because of the many independent variables that affect the signals. The current development program has used mathematical models and has developed or modified computer programs to design optimum probes, instrumentation, and techniques for multifrequency, multiproperty examinations. Interactive calculations and experimental measurements have used modular eddy-current instrumentation and a minicomputer. These establish the coefficients for the complex equations that define the values of the desired properties (and the attainable accuracy) despite changes in other significant variables. The computer programs for calculating the accuracy with which various properties can be measured indicate that the tubing wall thickness and the defect size can be measured much more accurately than is currently required, even when other properties vary.
- Research Organization:
- Oak Ridge National Lab., TN (USA)
- DOE Contract Number:
- W-7405-ENG-26
- OSTI ID:
- 5338234
- Report Number(s):
- NUREG/CR-2305-Vol.2; ORNL/TM-8161; ON: DE82010368
- Country of Publication:
- United States
- Language:
- English
Similar Records
Eddy-current inspection for steam-generator-tubing program quarterly progress report for period ending March 31, 1982. [PWR]
Eddy-current inspection for steam generator tubing program. Quarterly progress report for period ending September 30, 1979. [PWR]
Eddy-current inspection for steam generator tubing program. Quarterly progress report for period ending September 30, 1981. [PWR]
Technical Report
·
Wed Sep 01 00:00:00 EDT 1982
·
OSTI ID:6810835
Eddy-current inspection for steam generator tubing program. Quarterly progress report for period ending September 30, 1979. [PWR]
Technical Report
·
Fri Feb 29 23:00:00 EST 1980
·
OSTI ID:5566806
Eddy-current inspection for steam generator tubing program. Quarterly progress report for period ending September 30, 1981. [PWR]
Technical Report
·
Tue Jun 01 00:00:00 EDT 1982
·
OSTI ID:5239160
Related Subjects
21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS
210100* -- Power Reactors
Nonbreeding
Light-Water Moderated
Boiling Water Cooled
210200 -- Power Reactors
Nonbreeding
Light-Water Moderated
Nonboiling Water Cooled
BOILERS
BWR TYPE REACTORS
EDDY CURRENT TESTING
ELECTROMAGNETIC TESTING
MATERIALS TESTING
NONDESTRUCTIVE TESTING
PWR TYPE REACTORS
REACTORS
STEAM GENERATORS
TESTING
TUBES
VAPOR GENERATORS
WATER COOLED REACTORS
WATER MODERATED REACTORS
210100* -- Power Reactors
Nonbreeding
Light-Water Moderated
Boiling Water Cooled
210200 -- Power Reactors
Nonbreeding
Light-Water Moderated
Nonboiling Water Cooled
BOILERS
BWR TYPE REACTORS
EDDY CURRENT TESTING
ELECTROMAGNETIC TESTING
MATERIALS TESTING
NONDESTRUCTIVE TESTING
PWR TYPE REACTORS
REACTORS
STEAM GENERATORS
TESTING
TUBES
VAPOR GENERATORS
WATER COOLED REACTORS
WATER MODERATED REACTORS