Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Beta-gamma contaminated solid waste incinerator facility

Technical Report ·
DOI:https://doi.org/10.2172/5326149· OSTI ID:5326149
This technical data summary outlines a reference process to provide a 2-stage, 400 lb/hour incinerator to reduce the storage volume of combustible process waste contaminated with low-level beta-gamma emitters in response to DOE Manual 0511. This waste, amounting to more than 200,000 ft/sup 3/ per year, is presently buried in trenches in the burial ground. The anticipated storage volume reduction from incineration will be a factor of 20. The incinerator will also dispose of 150,000 gallons of degraded solvent from the chemical separations areas and 5000 gallons per year of miscellaneous nonradioactive solvents which are presently being drummed for storage.
Research Organization:
Du Pont de Nemours (E.I.) and Co., Aiken, SC (USA). Savannah River Lab.
DOE Contract Number:
AC09-76SR00001
OSTI ID:
5326149
Report Number(s):
DPSTD-79-34
Country of Publication:
United States
Language:
English