Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Probabilistic risk assessment of N Reactor using NUREG-1150 methods

Conference ·
DOI:https://doi.org/10.13182/NT91-A34601· OSTI ID:5321096

A Level III probabilistic risk assessment (PRA) has been performed for N Reactor, a US Department of Energy (DOE) Category A production reactor. The main contractor is Westinghouse Hanford Company (Westinghouse Hanford). The PRA methodology developed for the US Nuclear Regulatory Commission (NRC) by Sandia National Laboratories (SNL) in support of the NUREG-1150 (Reference 1) effort were used for this analysis. N Reactor is a graphite-moderated pressurized water reactor designed by General Electric. The dual-purpose 4000 MWt nuclear plant is located within the Hanford Site in the south-central part of the State of Washington. In addition to producing special materials for the DOE, N Reactor generates 860 MWe for the Washington Public Power Supply System. The reactor has been operated successfully and safely since 1963, and was put into standby status in 1988 due to the changing need in special nuclear material. 3 refs., 4 tabs.

Research Organization:
Westinghouse Hanford Co., Richland, WA (USA)
Sponsoring Organization:
DOE/DP
DOE Contract Number:
AC06-87RL10930
OSTI ID:
5321096
Report Number(s):
WHC-SA-0645; CONF-891103--47; ON: DE90003362
Country of Publication:
United States
Language:
English

Similar Records

DOE safety goals comparison using NUREG-1150 PRA (probabilistic risk assessment) methodology
Conference · Fri Jun 01 00:00:00 EDT 1990 · OSTI ID:6851795

Probabilistic risk assessment of the N Reactor using NUREG-1150 methods
Conference · Sat Dec 31 23:00:00 EST 1988 · Transactions of the American Nuclear Society; (USA) · OSTI ID:6434162

N reactor level III probabilistic risk assessment using NUREG-1150 methods
Journal Article · Thu Oct 31 23:00:00 EST 1991 · Nuclear Technology; (United States) · OSTI ID:5281556