Vitrification of Simulated Fernald K-65 Silo Waste at Low Temperature
Vitrification is the technology that has been chosen to solidify approximately 18,000 tons of geologic mill tailings at the Fernald Environmental Management Project (FEMP) in Fernald, Ohio. The geologic mill tailings are residues from the processing of pitchlende ore during 1949-1958. These waste residues are contained in silos in Operable Unit 4 (OU4) at the FEMP facility. Operable Unit 4 is one of five operable units at the FEMP. Operable Unit 4 is one of five operable units at the FEMP. Operating Unit 4 consists of four concrete storage silos and their contents. Silos 1 and 2 contain K-65 mill tailing residues and a bentonite cap, Silo 3 contains non-radioactive metal oxides, and Silo 4 is empty.
- Research Organization:
- Savannah River Site (US)
- Sponsoring Organization:
- US Department of Energy (US)
- DOE Contract Number:
- AC09-96SR18500
- OSTI ID:
- 5304
- Report Number(s):
- WSRC-TR-97-0061, Rev. 1
- Country of Publication:
- United States
- Language:
- English
Similar Records
Vitrification of Simulated Fernald K-65 Silo Waste at Low Temperature
Characterization of Fernald Silo 3 Waste