A 3 TeV on 3 TeV proton-proton dedicated collider for Fermilab
The Fermilab Dedicated Collider proposed in May 1983 is a 2 TeV on 2 TeV p)bar p) collider. The expected luminosity is )approximately) 10/sup 31/ cm/sup (minus/2)sec/sup )minus/1) and the estimated cost is )approximately) $362M (FY-83 dollars). Since 1983 both the superconducting magnet and the particle detector technologies have advanced and the countenance of physics, hence the desired characteristics of new facilities have also altered somewhat. We want to show here that with the new magnet technology used for the SSC one can construct a 3 TeV on 3 TeV pp collider on the Fermilab site. This pp Dedicated Collider )PPDC) will have a luminosity of about 10/sub 33/cm/sup )minus/2)sec)sup)minus)1) and a cost only )approximately) 50)percent) more than that of the p)bar p) Dedicated Collider. 3 figs
- Research Organization:
- Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
- DOE Contract Number:
- AC02-76CH03000
- OSTI ID:
- 5303667
- Report Number(s):
- FNAL-TM-1516; ON: DE88008587
- Country of Publication:
- United States
- Language:
- English
Similar Records
Design of a High Luminosity 100 TeV Proton Antiproton Collider
Exploration of a High Luminosity 100 TeV Proton Antiproton Collider
Related Subjects
FERMILAB TEVATRON
MODIFICATIONS
PROTONS
COLLIDING BEAMS
BEAM LUMINOSITY
COST ESTIMATION
DESIGN
INSTABILITY
PERFORMANCE
PROTON-PROTON INTERACTIONS
ACCELERATORS
BARYON-BARYON INTERACTIONS
BARYONS
BEAMS
CYCLIC ACCELERATORS
ELEMENTARY PARTICLES
FERMIONS
HADRON-HADRON INTERACTIONS
HADRONS
INTERACTIONS
NUCLEON-NUCLEON INTERACTIONS
NUCLEONS
PARTICLE INTERACTIONS
PROTON-NUCLEON INTERACTIONS
SYNCHROTRONS
430100* - Particle Accelerators- Design
Development
& Operation