Cycling of high-pressure-steam power-generating units with drum boilers. Final report
Technical Report
·
OSTI ID:5279771
In recent years, there has been an increased need to operate large fossil-fueled boilers in a cyclic mode. Such operation is unfortunately accompanied by a number of problems related to cyclic stresses, turndown limitations, energy losses, boiler-water quality, and control systems. Some success in dealing with these problems is being achieved through the use of variable-pressure operation, turbine bypasses, superheater bypasses, superheater division valves, firing-system modifications, and a number of miscellaneous design-modifications. Nevertheless, the need remains for further study of this topic. In the present study, the cyclic behavior of a boiler-turbine unit was investigated by both analytical and experimental methods. The main thrust of the study was the development of a new analytical model of transient boiler operation. This work was supplemented by a testing program at TVA's Widows Creek Station during which transient test-data was acquired on a cold start-up, a hot start-up, and a warm start-up. The development of the new analytical model included its formulation, implementation, validation, and documentation. The new analytical model is expected to be useful in many ways. It has already been used to identify critical boiler components during transient operation. In the future, the model can be used to determine the optimum operating procedures for boiler-turbine units engaged in cyclic duty and to develop design criteria for boilers intended for this service. The model can also serve as the basis for further model-development activities pertinent to both subcritical- and supercritical-pressure boilers.
- Research Organization:
- Tennessee Valley Authority, Chattanooga (USA). Div. of Energy Demonstrations and Technology; Combustion Engineering, Inc., Windsor, CT (USA); Mechanical Technology, Inc., Latham, NY (USA)
- OSTI ID:
- 5279771
- Report Number(s):
- EPRI-CS-2340; ON: DE82904050
- Country of Publication:
- United States
- Language:
- English
Similar Records
Study of universal-pressure boiler for cycling operation. Final report
Operating problems with startup valves in US and Japanese supercritical steam generators: Topical report
OH treatment for drum boilers
Technical Report
·
Tue Jun 01 00:00:00 EDT 1982
·
OSTI ID:5279738
Operating problems with startup valves in US and Japanese supercritical steam generators: Topical report
Technical Report
·
Sat Jul 01 00:00:00 EDT 1989
·
OSTI ID:5917799
OH treatment for drum boilers
Technical Report
·
Sat Dec 31 23:00:00 EST 1994
·
OSTI ID:50699
Related Subjects
20 FOSSIL-FUELED POWER PLANTS
200104* -- Fossil-Fueled Power Plants-- Components
BOILERS
DAILY VARIATIONS
DEMAND
ENERGY DEMAND
FOSSIL-FUEL POWER PLANTS
LOAD MANAGEMENT
MACHINERY
MANAGEMENT
MATHEMATICAL MODELS
POWER PLANTS
START-UP
STRESSES
TEMPERATURE GRADIENTS
THERMAL POWER PLANTS
THERMAL STRESSES
TURBINES
TURBOMACHINERY
VARIATIONS
200104* -- Fossil-Fueled Power Plants-- Components
BOILERS
DAILY VARIATIONS
DEMAND
ENERGY DEMAND
FOSSIL-FUEL POWER PLANTS
LOAD MANAGEMENT
MACHINERY
MANAGEMENT
MATHEMATICAL MODELS
POWER PLANTS
START-UP
STRESSES
TEMPERATURE GRADIENTS
THERMAL POWER PLANTS
THERMAL STRESSES
TURBINES
TURBOMACHINERY
VARIATIONS