Title: Pretest analysis document for Test S-FS-11

Technical Report ·
OSTI ID:5278417

This report documents the pretest calculations completed for Semiscale Test S-FS-11. This test will simulate a transient initiated by a 50% break in a steam generator bottom feedwater line downstream of the check valve. The initial conditions represents normal operating conditions for a C-E System 80 nuclear plant. Prediction of transients resulting from feedwater line breaks in these plants have indicated that significant primary system overpressurization may occur. The results of a RELAP5/MOD2/CY21 code calculation indicate that the test objectives for Test S-FS-11 can be achieved. The primary system overpressurization will occur but pose no threat to personnel or plant integrity. 3 refs., 15 figs., 5 tabs.

Research Organization:
EG and G Idaho, Inc., Idaho Falls (USA)
DOE Contract Number:
AC07-76ID01570
OSTI ID:
5278417
Report Number(s):
EGG-SEMI-6985; ON: TI85017495
Country of Publication:
United States
Language:
English