Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Test procedure for the principal borehole RRL-2

Technical Report ·
OSTI ID:5273588

The principal borehole shall satisfy the first objective for the Exploratory Shaft -- Phase I in basalt. It ascertains the suitability of the proposed location and provides design information for an exploratory shaft in the reference repository location. The test procedure includes all details for the drilling and testing of the principal borehole RRL-2. It includes the predicted stratigraphy, the drilling requirements, description of tests to be conducted, intervals selected for hydrology testing, and a schedule of the drilling and testing activities.

Research Organization:
Rockwell International Corp., Richland, WA (USA). Rockwell Hanford Operations
Sponsoring Organization:
DOE/RW
DOE Contract Number:
AC06-77RL01030
OSTI ID:
5273588
Report Number(s):
RHO-BWI-TC-001-Rev.2; ON: TI90004823
Country of Publication:
United States
Language:
English