Preliminary PBFA II design
Conference
·
OSTI ID:5271389
The upgrade of Sandia National Laboratories particle beam fusion accelerator, PBFA I, to PBFA II presents several interesting and challenging pulsed power design problems. PBFA II requires increasing the PBFA I output parameters from 2 MV, 30 TW, 1 MJ to 4 MV, 100 TW, 3.5 MJ with the constraint of using much of the same PBFA I hardware. The increased PBFA II output will be obtained by doubling the number of modules (from 36 to 72), increasing the primary energy storage (from 4 MJ to 15 MJ), lowering the pulse forming line (PFL) output impedance, and adding a voltage doubling network.
- Research Organization:
- Sandia National Labs., Albuquerque, NM (USA)
- DOE Contract Number:
- AC04-76DP00789
- OSTI ID:
- 5271389
- Report Number(s):
- SAND-80-0461C; CONF-800640-1
- Country of Publication:
- United States
- Language:
- English
Similar Records
Particle beam fusion accelerator-I (PBFA-I)
Improved shielding calculations for the particle beam fusion accelerator PBFA II
Pulsed power performance of PBFA Z
Conference
·
Mon Jun 01 00:00:00 EDT 1981
· IEEE Trans. Nucl. Sci.; (United States)
·
OSTI ID:5108838
Improved shielding calculations for the particle beam fusion accelerator PBFA II
Conference
·
Tue Dec 31 23:00:00 EST 1985
·
OSTI ID:5876015
Pulsed power performance of PBFA Z
Conference
·
Fri Aug 01 00:00:00 EDT 1997
·
OSTI ID:505712
Related Subjects
43 PARTICLE ACCELERATORS
430100 -- Particle Accelerators-- Design
Development
& Operation
70 PLASMA PHYSICS AND FUSION TECHNOLOGY
700208* -- Fusion Power Plant Technology-- Inertial Confinement Technology
DESIGN
ELECTRICAL EQUIPMENT
ELECTRONIC CIRCUITS
ELECTRONIC EQUIPMENT
EQUIPMENT
PARTICLE BEAM FUSION ACCELERATOR
POWER SUPPLIES
SPECIFICATIONS
SWITCHES
430100 -- Particle Accelerators-- Design
Development
& Operation
70 PLASMA PHYSICS AND FUSION TECHNOLOGY
700208* -- Fusion Power Plant Technology-- Inertial Confinement Technology
DESIGN
ELECTRICAL EQUIPMENT
ELECTRONIC CIRCUITS
ELECTRONIC EQUIPMENT
EQUIPMENT
PARTICLE BEAM FUSION ACCELERATOR
POWER SUPPLIES
SPECIFICATIONS
SWITCHES