400 MWe commercial OTEC plants: review of reports by Gibbs and Cox, Inc. , Lockheed Missile and Space Corporation, M. Rosenblatt and Sons
The Department of Energy contracted with Gibbs and Cox, M. Rosenblatt and Son and Lockheed Missile and Space Corporation to prepare conceptual designs, cost estimates and analyses for a 400 MWe OTEC Commercial Size platform. Each contractor was directed to investigate two predetermined hull configurations and to relate them to one operating site, selected by DOE. A total of 6 designs, covering sphere, spar, ship and semisubmersibles were studied by the three contractors. The results of their investigations were presented by DOE in Washington on May 8, 1978. The presentations showed that whereas a considerable data base has been built, no clear conclusions had emerged with respect to the direction that future design of the commercial platform should take. JJMA has been directed by Value Engineering on behalf of DOE to review the conceptual designs and the accompanying data base prepared by the three contractors. The intent of this review is to propose to DOE the answers to the following questions, based on the results of studies by the three contractors: (1) If DOE were to build a 400 MW OTEC plant, starting now, what should they build. (2) What are the reasons for the decisions. (3) What would it cost. Results are detailed.
- Research Organization:
- McMullen (John J.) Associates, Inc., New York (USA)
- Sponsoring Organization:
- USDOE
- DOE Contract Number:
- ET-78-C-02-4931
- OSTI ID:
- 5264591
- Report Number(s):
- COO-4931-3
- Country of Publication:
- United States
- Language:
- English
Similar Records
OTEC platform configuration and integration. Volume II. Technical concept. Final report
OTEC platform configuration and integration. Executive summary. Final report
Assessment of US shipbuilding current capability to build a commercial OTEC platform and a cold water pipe
Technical Report
·
Fri Jul 07 00:00:00 EDT 1978
·
OSTI ID:6456992
OTEC platform configuration and integration. Executive summary. Final report
Technical Report
·
Wed Jul 26 00:00:00 EDT 1978
·
OSTI ID:6493530
Assessment of US shipbuilding current capability to build a commercial OTEC platform and a cold water pipe
Technical Report
·
Fri Feb 29 23:00:00 EST 1980
·
OSTI ID:5304978