Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Coal to methanol feasibility study: Beluga methanol project. Volume II. Technical. Final report

Technical Report ·
OSTI ID:5252834
Volume II conatins the rationale for and conceptual design of the coal to methanol plant, and describes the feedstock, the selected processes, facilities, auxiliaries, utilities, buildings, equipment, plant operations and products. The text provides a general review of data on the methanol product, its utilization and production; the selection of processes, descriptions of the plant facilities, and an assessment of the technical viability of the Beluga Coal to Methanol Project as outlined in this Phase I Feasibility Study.
Research Organization:
Cook Inlet Region, Inc./Placer Amex, Inc., San Francisco, CA (USA)
DOE Contract Number:
FG01-80RA50299
OSTI ID:
5252834
Report Number(s):
DOE/RA/50299-1119-Vol.2; ON: DE82005901
Country of Publication:
United States
Language:
English