ERDA/NASA 100-kilowatt Mod-0 wind turbine operations and performance
Conference
·
OSTI ID:5252397
The ERDA/NASA 100 kW Mod-0 wind turbine became operational in September 1975 at the NASA Plum Brook Station near Sandusky, Ohio. The operation of the wind turbine has been fully demonstrated and includes start-up, synchronization to the utility network, blade pitch control for control of power and speed, and shut-down. Also, fully automatic operation has been demonstrated by use of a remote control panel, 50 miles from the site, similar to what a utility dispatcher might use. This report briefly describes the operation systems and experience with the wind turbine loads, electrical power and aerodynamic performance obtained from testing.
- Research Organization:
- National Aeronautics and Space Administration, Cleveland, Ohio (USA). Lewis Research Center
- DOE Contract Number:
- EX-76-A-29-1028
- OSTI ID:
- 5252397
- Report Number(s):
- ERDA/NASA/1028-77/9; NASA-TM-73825; CONF-770921-6
- Country of Publication:
- United States
- Language:
- English
Similar Records
Dynamic blade loading in the ERDA--NASA 100 kW and 200 kW wind turbines
Fabrication and assembly of the ERDA/NASA 100-kilowatt experimental wind turbine
Early operation experience on the ERDA/NASA 100 kW wind turbine
Conference
·
Fri Dec 31 23:00:00 EST 1976
·
OSTI ID:7212981
Fabrication and assembly of the ERDA/NASA 100-kilowatt experimental wind turbine
Technical Report
·
Wed Mar 31 23:00:00 EST 1976
·
OSTI ID:7266055
Early operation experience on the ERDA/NASA 100 kW wind turbine
Technical Report
·
Wed Sep 01 00:00:00 EDT 1976
·
OSTI ID:7318293