Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Remote instrument/electrical wall nozzle replaement in the Defense Waste Processing Facility

Technical Report ·
OSTI ID:5250876
The Defense Waste Processing Facility (DWPF) for waste vitrification at the Savannah River Plant is in the final design stage. Development of remotely replaceable instrument and electrical through-wall wiring is now complete. These assemblies connect the power and control signals from the high radiation environment to the personnel access areas. The ability to replace them will extend the life and lower the cost of the DWPF. 3 references, 22 figures, 2 tables.
Research Organization:
Du Pont de Nemours (E.I.) and Co., Aiken, SC (USA). Savannah River Lab.
DOE Contract Number:
AC09-76SR00001
OSTI ID:
5250876
Report Number(s):
DP-1669; ON: DE84007442
Country of Publication:
United States
Language:
English