Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Main steam vent line piping and valve support reanalysis

Technical Report ·
DOI:https://doi.org/10.2172/5241566· OSTI ID:5241566
A new support configuration for the one-inch Schedule 80 main steam vent line has been developed at the request of the LOFT Plant Systems Branch. This configuration will adequately support valves CV-P4-58 and CV-P4-59 without requiring supports at the centers of gravity of these valves as previously recommended. Dead weight, thermal expansion, seismic, LOCE and LOCA loading conditions were considered. Results indicate that the main steam vent piping will meet criteria specified in the ASME Code provided the recommendations, as listed in the report, are followed.
Research Organization:
Idaho National Engineering Lab., Idaho Falls (USA)
DOE Contract Number:
EY-76-C-07-1570
OSTI ID:
5241566
Report Number(s):
LTR-115-23
Country of Publication:
United States
Language:
English