Functional design criteria exploratory shaft power line and substation Project B-417

Technical Report ·
OSTI ID:5234844
This project will provide a 13.8-KV, 3-phase electrical power line from substation B-251 to the ES site. The power line will be sized to carry the 6000 KVA power required to meet the construction and operations power requirements of the facility. The line will originate at an existing circuit breaker at the 13.8 KV switch gear at substation B-251 and will terminate at fused cutouts at the ES site. Wood poles will be used for the aerial support of the {approximately}4.7 mile transmission line. Joint use of the line by project B-316 is being considered. The substation will provide transformation from 13.8 KV to 2.4 KV, transformer mounting, grounding grid for the entire substation, the substation fence, and connection between the primary side of the transformer and the 13.8 KV electrical line (last pole) provided by Part 1. Switching stations, protective devices, and metering, which are normally part of a substation, will be provided by the ES Project, B-314. 10 refs.
Research Organization:
Rockwell International Corp., Richland, WA (USA). Rockwell Hanford Operations
Sponsoring Organization:
DOE/RW
DOE Contract Number:
AC06-77RL01030
OSTI ID:
5234844
Report Number(s):
RHO-BWI-FDC-002; ON: TI90004752
Country of Publication:
United States
Language:
English