Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Revised ground-water monitoring compliance plan for the 183-H Solar Evaporation Basins

Technical Report ·
OSTI ID:5229840
This document contains ground-water monitoring plans for a mixed waste storage facility located on the Hanford Site in southeastern Washington State. This facility has been used since 1973 for storage of mixed wastes, which contain both chemicals and radionuclides. The ground-water monitoring plans presented here represent revision and expansion of an effort in June 1985. At that time, a facility-specific monitoring program was implemented at the 183-H Basins as part of the regulatory compliance effort being conducted on the Hanford Site. This monitoring program was based on the ground-water monitoring requirements for interimstatus facilities, which are those facilities that do not yet have final permits, but are authorized to continue interim operations while engaged in the permitting process. The program initially implemented for the 183-H Basins was designed to be an alternate program, which is required instead of the standard detection program when a facility is known or suspected to have contaminated the ground water in the uppermost aquifer. This effort, named the RCRA Compliance Ground-Water Monitoring Project for the 183-H Basins, was implemented. A supporting project involving ground-water flow modeling for the area surrounding the 183-H Basins was also initiated during 1985. Those efforts and the results obtained are described in subsequent chapters of this document. 26 refs., 55 figs., 14 tabs.
Research Organization:
Pacific Northwest Lab., Richland, WA (USA)
DOE Contract Number:
AC06-76RL01830
OSTI ID:
5229840
Report Number(s):
PNL-6470; ON: DE88007394
Country of Publication:
United States
Language:
English

Similar Records

Results of Groundwater Monitoring for the 183-H Solar Evaporation Basins
Technical Report · Mon Oct 30 23:00:00 EST 2006 · OSTI ID:896350

Revised ground-water monitoring compliance plan for the 300 area process trenches
Technical Report · Thu Sep 01 00:00:00 EDT 1988 · OSTI ID:7056555

Interim characterization report for the area surrounding the 183-H Basins
Technical Report · Tue Mar 31 23:00:00 EST 1987 · OSTI ID:5201600