Cost and schedule control systems criteria for contract performance measurement. Implementation guide. [Contains glossary]
This document provides uniform guidance for implementation of the DOE Order 2250.1, Cost and Schedule Control Systems Criteria (CSCSC) for Contract Performance Measurement. Its purpose is to assist both DOE and contractor representatives in fulfilling their responsibilities for meeting CSCSC requirements. Compliance with the contractual requirements for work definition, cost and schedule control, and performance reporting should provide increased assurance that a contractor's progress is sufficiently visible to indicate status reliably and to provide the basis for timely and meaningful management decisions. 8 figures. (RWR)
- Research Organization:
- Department of Energy, Washington, DC (USA). Office of the Controller
- OSTI ID:
- 5206615
- Report Number(s):
- DOE/CR-0015
- Country of Publication:
- United States
- Language:
- English
Similar Records
Implementation guide. Cost and Schedule Control Systems Criteria for Contract Performance Measurement
Cost and schedule control systems criteria for contract performance measurement. Implementation guide
Cost and Schedule Control Systems Criteria for Contract Performance Measurement: Systems Review/Surveillance Guide
Technical Report
·
Tue Dec 31 23:00:00 EST 1985
·
OSTI ID:6072088
Cost and schedule control systems criteria for contract performance measurement. Implementation guide
Technical Report
·
Thu May 01 00:00:00 EDT 1980
·
OSTI ID:5746368
Cost and Schedule Control Systems Criteria for Contract Performance Measurement: Systems Review/Surveillance Guide
Technical Report
·
Sat Oct 31 23:00:00 EST 1981
·
OSTI ID:5496734