10 MWe Solar Thermal Central Receiver Pilot Plant: solar facilities design integration. MCS hardware procurement documentation (RADL Item 6-2). Revision

Technical Report ·
OSTI ID:5201691

Specifications are provided for the components of the master control system of the Barstow Solar Pilot Plant. The equipment specified includes: a subsystem distributed process control, special heliostat instrumentation, a meteorological measurement system, a data acquisition remote multiplexer system, a circumsolar telescope interface unit, a video camera system, and data acquisition and operational control system configurations.