Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Technology, safety and costs of decommissioning nuclear reactors at multiple-reactor stations

Technical Report ·
OSTI ID:5196674

Safety and cost information is developed for the conceptual decommissioning of large (1175-MWe) pressurized water reactors (PWR) and large (1155-MWe) boiling water reactors (BWR) at multiple-reactor stations. Three decommissioning alternatives are studied: DECON (immediate decontamination), SAFSTOR (safe storage followed by deferred decontamination), and ENTOMB (entombment). Safety and costs of decommissioning are estimated by determining the impact of probable features of multiple-reactor-station operation that are considered to be unavailable at a single-reactor station, and applying these estimated impacts to the decommissioning costs and radiation doses estimated in previous PWR and BWR decommissioning studies. The multiple-reactor-station features analyzed are: the use of interim onsite nuclear waste storage with later removal to an offsite waste disposal facility, the use of permanent onsite nuclear waste disposal, the dedication of the site to nuclear power generation, and the provision of centralized services.

Research Organization:
Battelle-Northwest, Richland, WA (USA). Pacific Northwest Lab.
OSTI ID:
5196674
Report Number(s):
NUREG/CR-1755
Country of Publication:
United States
Language:
English