Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Mark I 1/5-scale boiling water reactor pressure suppression experiment facility report

Technical Report ·
DOI:https://doi.org/10.2172/5190456· OSTI ID:5190456
An accurate Mark I /sup 1///sub 5/-scale, boiling water reactor (BWR), pressure suppression facility was designed and constructed at Lawrence Livermore Laboratory (LLL) in 11 months. Twenty-seven air tests using the facility are described. Cost was minimized by utilizing equipment borrowed from other LLL programs. The total value of borrowed equipment exceeded the program's budget of $2,020,000. Substantial flexibility in the facility was used to permit independent variation in the drywell pressure-time history, initial pressure in the drywell and toroidal wetwells, initial toroidal wetwell water level and downcomer length, vent line flow resistance, and vent line flow asymmetry. The two- and three-dimensional sectors of the toroidal wetwell provided significant data.
Research Organization:
California Univ., Livermore (USA). Lawrence Livermore Lab.
DOE Contract Number:
W-7405-ENG-48
OSTI ID:
5190456
Report Number(s):
UCRL-52340
Country of Publication:
United States
Language:
English