Penstock inspection and safety assessment program: Big Thompson Powerplant Colorado-Big Thompson Project, Colorado. Review report, Great Plains region

Technical Report ·
OSTI ID:518743
On February 26-28, 1997, and June 16-17, 1997, the Big Thompson penstock was inspected. During the exam the following tasks were performed: (1) The condition of the exposed exterior coating and the interior lining of the penstock was inspected; (2) The wall thickness of the steel penstock was determined by ultrasonic testing; (3) Appurtenances where the penstock and piping connected to the penstock change in diameter or where the water flow changes in direction were inspected; (4) Joints, piping connections, and various associated operating equipment (gates, valves, etc.) were inspected; (5) Load rejection tests, unwatered governor testing, and emergency gate closure tests were performed.
Research Organization:
Bureau of Reclamation, Denver, CO (United States). Technical Service Center
OSTI ID:
518743
Report Number(s):
PB--97-185920/XAB
Country of Publication:
United States
Language:
English

Similar Records

Global climate change response program. Climate trends in the Colorado-Big Thompson Project area. Final report
Technical Report · Thu Sep 01 00:00:00 EDT 1994 · OSTI ID:6576055

Tunnel Inspection Meets Outage Schedule
Conference · Thu Dec 31 23:00:00 EST 1987 · Proceedings of the American Power Conference; (USA) · OSTI ID:6914551

Dealing with a penstock rupture: A success story
Journal Article · Sun Aug 01 00:00:00 EDT 1993 · Hydro Review; (United States) · OSTI ID:6029436