skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: GAC--ANL TNS scoping studies. Status report for FY-77, October 1, 1976--September 30, 1977. Volume VII. Remote maintenance system

Technical Report ·
DOI:https://doi.org/10.2172/5182233· OSTI ID:5182233

A study has been performed to develop a conceptual design of a maintenance system for the doublet-type 3.8 meter Ignition Test Reactor (ITR) concept developed for The Next Step (TNS) fusion reactor program. The maintenance concept was developed in accordance with the ''low exposure exterior'' or minimized remote maintenance concept. This report provides an outline of the contact and remote maintenance requirements and descriptions of various equipment necessary to fulfill these requirements. Included are step-by-step outline operational procedures and preliminary cost and schedule estimates for Title I, Title II, and Title III engineering operations and Title III equipment fabrication.

Research Organization:
General Atomics, San Diego, CA (United States)
DOE Contract Number:
EY-76-C-03-0167-038
OSTI ID:
5182233
Report Number(s):
GA-A-14614(Vol.7); TRN: 78-006505
Country of Publication:
United States
Language:
English