Project Gasoline: Volume III, Book 1. Research on zinc chloride catalyst for converting coal to gasoline. Phase I. Hydrocracking of coal and extract with zinc chloride. Interim report, Aug 1963-Jun 1968. [Overall objective to develop superior hydrocracking catalyst; use of molten ZnCl/sub 2/ in large concentrations relative to feed extract]
Technical Report
·
OSTI ID:5151664
- Research Organization:
- Consolidation Coal Co., Library, Pa. (USA). Research Div.
- DOE Contract Number:
- DI-14-01-0001-310
- OSTI ID:
- 5151664
- Report Number(s):
- PB-234127; OCR-39-(Vol.3-Bk.1)
- Country of Publication:
- United States
- Language:
- English
Similar Records
Project Gasoline: Volume III, Book 2. Pre-pilot plant research on the CSF process. Phase I. Regeneration of zinc chloride catalyst. Interim report, Aug 1963-Jun 1968. [Zinc chloride catalyst shows outstanding results when used in relatively large volume as molten phase, catalyst regeneration comprises removal of S, N, C, and mineral impurities; review of experimental studies on various processing steps]
Project Gasoline: Volume II. Pre-pilot plant phase I research on CSF process. Part 1. Coal extraction, extract filtration and extract deashing. Part 2. Hydrocracking studies with support catalyst. Interim report, Aug 1963-Jun 1968
Project Gasoline: Volume IV, Book 1. Pilot plant research and development. PHase II. Design and construction of the CSF pilot plant, Cresap, WV. Interim report, Aug 1963-Jun 1968. [History of engineering and construction of coal-based synthetic liquid fuel pilot plant erected at Cresap, WV]
Technical Report
·
Thu Aug 01 00:00:00 EDT 1968
·
OSTI ID:5151664
Project Gasoline: Volume II. Pre-pilot plant phase I research on CSF process. Part 1. Coal extraction, extract filtration and extract deashing. Part 2. Hydrocracking studies with support catalyst. Interim report, Aug 1963-Jun 1968
Technical Report
·
Thu Aug 01 00:00:00 EDT 1968
·
OSTI ID:5151664
Project Gasoline: Volume IV, Book 1. Pilot plant research and development. PHase II. Design and construction of the CSF pilot plant, Cresap, WV. Interim report, Aug 1963-Jun 1968. [History of engineering and construction of coal-based synthetic liquid fuel pilot plant erected at Cresap, WV]
Technical Report
·
Sun Sep 01 00:00:00 EDT 1968
·
OSTI ID:5151664
Related Subjects
01 COAL, LIGNITE, AND PEAT
COAL
HYDROGENATION
COAL LIQUEFACTION
CSF PROCESS
CATALYSTS
GASOLINE
PRODUCTION
ZINC CHLORIDES
CARBONACEOUS MATERIALS
CHEMICAL REACTIONS
CHLORIDES
CHLORINE COMPOUNDS
ENERGY SOURCES
FOSSIL FUELS
FUELS
HALIDES
HALOGEN COMPOUNDS
LIQUEFACTION
PETROLEUM PRODUCTS
ZINC COMPOUNDS
ZINC HALIDES
010405* - Coal
Lignite
& Peat- Hydrogenation & Liquefaction
010403 - Coal & Coal Products- Hydrogenation- (-1987)
COAL
HYDROGENATION
COAL LIQUEFACTION
CSF PROCESS
CATALYSTS
GASOLINE
PRODUCTION
ZINC CHLORIDES
CARBONACEOUS MATERIALS
CHEMICAL REACTIONS
CHLORIDES
CHLORINE COMPOUNDS
ENERGY SOURCES
FOSSIL FUELS
FUELS
HALIDES
HALOGEN COMPOUNDS
LIQUEFACTION
PETROLEUM PRODUCTS
ZINC COMPOUNDS
ZINC HALIDES
010405* - Coal
Lignite
& Peat- Hydrogenation & Liquefaction
010403 - Coal & Coal Products- Hydrogenation- (-1987)