skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Long-term effects of dredging operations program. Collation and interpretation of data for Times Beach confined disposal facility, Buffalo, New York. Final report

Technical Report ·
OSTI ID:5142328

This interim report, collates all data gathered for the Times Beach confined disposal facility (CDF), Buffalo, New York. This purpose of the studies at the CDF was to determine the mobility and potential hazard of contaminants known to be in the dredged material placed at Times Beach by sampling and analyzing various components of the developing ecosystems. Upland, wetland, and aquatic areas are represented within the CDF and, for each area, inventories of colonizing biota were made and samples collected for measurement of heavy metals and organic compound contaminants. Samples of dredged material, vegetation, and soil-dwelling invertebrates, and vertebrates have been collected and heavy metal concentrations measured. Results suggest that the persistent contaminants, particularly cadmium, are concentrating in the leaf litter zone and moving into the detritivorous invertebrates. Highest concentrations of heavy metals were noted in earthworms. Earth worms, millipedes, woodlice, and spiders appeared to be target organisms for accumulation of heavy metals, and these groups contained higher concentrations of copper and cadmium than the other groups. Polychlorinated biphenyl (PCB) and polynuclear aromatic hydrocarbon contaminants in the dredged material were below machine detection limits in the vertebrate top-predators. Contaminant concentrations in water from ground water wells were below guidance limits.

Research Organization:
Army Engineer Waterways Experiment Station, Vicksburg, MS (United States). Environmental Lab.
OSTI ID:
5142328
Report Number(s):
AD-A-239637/2/XAB
Country of Publication:
United States
Language:
English

Similar Records

Sediment chemistries and chironomid deformities in the Buffalo River (NY)
Conference · Sat Dec 31 00:00:00 EST 1994 · OSTI ID:5142328

Buffalo river dredging demonstration. Final report
Technical Report · Thu Feb 01 00:00:00 EST 1996 · OSTI ID:5142328

Reducing uncertainty in ecological risk assessment: The pros of measuring contaminant exposures
Conference · Sun Dec 31 00:00:00 EST 1995 · OSTI ID:5142328