SOLERAS - Solar Controlled Environment Agriculture Project. Final report, Volume 9. Science Applications, Incorporated Phase 2 - definition study

Technical Report ·
DOI:https://doi.org/10.2172/5122195· OSTI ID:5122195
This report describes the effort required to implement the design of the Solar Controlled Environment Agriculture Engineering Test Facility, SCEA-ETF. This report is a basic blueprint for the Phase 2 activities which have as a goal the construction of the ETF. These activities have been broken down into five major tasks, namely Project Management; Engineering and Design; Procurement/Fabrication; Construction, Installation and Checkout; and Operation and Maintenance. The type of activities required under each of these tasks are described followed by a detailed work breakdown structure. The Phase 2 project organization is discussed. A 13 month schedule for the total project is also given. Lastly, two appendices discuss cost adjustment factors for an ETF located in the KSA, and an update of the commercial system cost estimate based on preliminary cost quotations for the ETF. The results show a 63% cost increase for the KSA ETF primarily due to higher construction costs and greater well depth. The commercial system cost required an adjustment upwards of 7.7%.
Research Organization:
Midwest Research Inst., Kansas City, MO (USA)
DOE Contract Number:
AC02-83CH10093
OSTI ID:
5122195
Report Number(s):
MRI/SOL-0800-09; ON: DE86001282
Country of Publication:
United States
Language:
English